A wind farm that was rejected by a state panel in 2013 is asking for a re-hearing.
Antrim Wind is asking state regulators this week to take ultimate authority over whether the wind-farm gets built. Portsmouth-based Eolian Renewable Energy it has eliminated one turbine and shrunk a second from its initial 10-turbine proposal, and the new project is different enough that it should get a second hearing before the state.